And the power companies can trim all around the lines, still can have a tree 40Ft take out the span. I spent 2 weeks in the FL Pan Handle for work doing recovery and breath taking what CAT 5 damage looks like. Having food for at least 2 weeks and tarps/plywood for roofs are some of the immediate needs. Dorian was 75 miles off our coast before turning, thought it was lights out with that one but thankfully we were spared.