Once the WWB event (causing interference on the RMM PCs) is finished (likely first week of January per EPS), the RMM PCs will relatch back onto the true location of the MJO - which will result in the MJO signal per RMM to orbit into Phase 6-7. pic.twitter.com/vNWe2ZLbti

— Mike Ventrice (@MJVentrice) December 28, 2018